The site preparation sheet

A considered room. A clearer survey.

Agree the actual arrangements with the operator before moving furniture or changing access.

01

Describe the space

List rooms, approximate area, known stone, condition and any previous treatments. Keep confidential building records out of the general form.

02

Arrange access

Confirm the real arrival window, parking or loading, permissions, utility needs and communication/access preferences.

03

Protect and prepare

Ask what the team will move or protect and what the customer must arrange. Discuss fragile surroundings, children and pets.

04

Plan return to use

Follow the actual method/product instructions and agreed safe routes. Do not infer drying time from a template example.

Keep the scope together.

Material, finish, condition and access belong in the same conversation. A written proposal defines the actual work and responsibilities.

Example fees ↗Questions ↗Plan a survey