Project study
The courtyard
reset.
A sheltered courtyard in Raleigh was prepared for spring with a defined paving clean, careful edge work and a clear plan for moving furniture.
ILLUSTRATIVE MATERIAL STUDY · NOT AN ACTUAL RESULT
A place for
spring again.
The brief brings the paving, edges and furniture arrangements into one considered preparation plan. The aim is a clear scope for the courtyard’s next chapter.
COURTYARD NOTE 01
Before the visit
Review the paving material, joints and drainage. Agree furniture movement and the areas to protect.
COURTYARD NOTE 02
During the work
Keep the working zone clear and the method connected to the material and surrounding finishes.
COURTYARD NOTE 03
At the handover
Review the completed scope and the return-to-use guidance. Keep the agreed care information with the project notes.
This is a fictional planning study. The illustrations do not show a verified before-and-after result.
More outside.
Less buildup.
Tell us about the surface, the space and the clean you have in mind. We’ll help make the next step simple.
Get a fresh quote